With help from my friend, Jim V. and my Dad, we got the tail installed. There is still a little bit of work: wiring the tail light, wiring the yaw trim motor, and connecting the rudder cables. The tail actually turned out to be more effort than the wings.
There was a very slight interference between the rudder and the top of the vertical stabilizer. With a bit of sanding the interference is gone.
I had my friends Charlie and John (and my Dad) help me with the wings. Both wings took a total of about 1.5 hours from start to finish. The left wing was a little more difficult than the right wing (which only took about 10 minutes). I need to do the final torquing of the 9 bolts in each wing root. I also still need to do a bunch of wiring and plumbing.
John and I also installed the comm antennas on the belly of the airplane.
Upcoming tasks: realign main gear to remove some of the toe in. Install the TP-59 temperature sensor in the left wing. Connect several wires in each wing (mostly just connecting the CPC connectors).
I feel like we might be able to run the engine for the first time next weekend.
20 hours.